Yesterday afternoon, our team had a productive in-person meeting with senior planning staff at the City of Toronto. The purpose of the meeting was to talk about the challenges associated with delivering infill missing middle housing and to brainstorm the possible solutions.
Some of the key topics that we discussed: Type-G loading / garbage requirements, amenity space requirements, right-sizing the Site Plan Control process, single-stair exiting, the cost of connecting to Toronto Hydro, the challenges with assembling small lots, specifics of the Major Street Study, and a bunch of other things. So many of the things that we regularly talk about on this blog.
We also walked everyone through the site we had under contract but eventually dropped because the margins were just too thin. This included opening up our pro forma, projecting it onto the screen, and going through it line-by-line. We are happy to do this because we think this transparency helps everyone truly understand the obstacles.
What's clear is that we all want to see more family-friendly housing lining our avenues and major streets. And so there's a real feeling of collaboration during meetings like the one we had yesterday. We're all at the stage of "what is it going to take? Let's figure it out!" This can-do attitude makes me feel optimistic that we are going to get there. And once we do, Toronto will be that much better for it.
It was also nice having an in-person meeting back at City Hall. To be honest, I can't remember the last time I did that. But it used to be standard operating procedure. We'd all arrive early, huddle in the cafe at the bottom of the building for a pre-meeting, and then look around to see what other teams/projects were also on deck with the city. It made me feel nostalgic — and older.
Enjoy the weekend, everyone.
Over 4.1k subscribers
This is all brilliant and I commend you for your efforts! The city desperately needs what you are proposing! Good luck!