
I was lollygagging on Bloor last night while waiting for my take-out sushi to be prepared when I happened to notice the above building at 1639 Bloor Street West.
What stood out to me was that it’s six storeys, has no stepbacks, is brick all around, and is more or less the kind of infill housing that Toronto is now trying to encourage along its major streets. Except, this building is old. The internet tells me it was built in 1954 (and houses 46 apartments). Which made me immediately wonder: did we used to know how to build this housing typology and then simply forget? Or was this the work of a cowboy developer who somehow managed to slip it through the cracks?
Either way, I decided to walk the perimeter and take a closer look. The first thing I noticed was a row of garbage bins along the building’s east elevation, with about a dozen or so cameras keeping a close eye on them. If anyone in building management is wondering why a handsome man in a black t-shirt and stylish Birkenstocks was so curious about garbage bins — don’t worry. I was just trying to determine if you had a Type-G loading bay hidden around the back. I can now confirm: no such loading facility.
Looking at Toronto’s maps, the site is approximately 30 meters wide by 40 meters deep — so roughly the equivalent of five lots, given the prevailing lot fabric in the area. The building itself appears to have a footprint of about 660 square metres (~7,100 square feet). If I multiply this by six floors and then by an efficiency ratio of 0.80, I get a very rough gross rentable area of 31,000 square feet. Divide this by 46 apartments and you end up with an average suite size of ~741 square feet.
Imagine that: assemble five lots on Bloor, employ an all-brick façade on all elevations, and build to an average suite size that is probably close to 200 square feet larger than some of the city’s most recent downtown developments. The math would never math today.
As you know, sixplexes are now permitted in certain parts of Toronto. We've spoken before about how it should be all of Toronto; but nevertheless, they are allowed in areas where they were not allowed before. That constitutes progress.
But it gets much better: This week, Mayor Chow announced that she will be bringing forward a motion to Council to eliminate development charges and parkland dedication cash-in-lieu requirements for new developments of up to six residential homes. This is a big deal and something that is necessary if we want to spur more rental housing.
To quote my friend Craig Race (of Craig Race Architecture), "this is the first thing [Olivia Chow has] done I'm happy about, and I hope to see more." Mayor Chow was criticized for standing around while sixplexes were being debated, and so this is perhaps her now trying to step up. Whatever it is, home builders will take it.
Globizen wasn't looking at this scale before, but I'm now going to adapt one of our screening models to see if the math works. If it does, then expect the industry to mobilize around it.
