Daily insights for city builders, delivered every morning at 6 AM ET. I’m Brandon Donnelly — a Toronto-based real estate developer and founder of Globizen. I’ve been writing here since 2013.

Tag: missing middle

  • The mini mid-rise

    It is obvious that Toronto needs to find new ways to increase housing supply. And I have written before about how I think our major streets are a good place to look.

    The above proposal by Naama Blonder of Smart Density is one way to start thinking about how we could do that. Dubbed the “mini mid-rise”, the idea here was to show how a single lot might be intensified with a small multi-unit building.

    This is a great idea. It was one of five projects that just won the Ontario Association of Architects’ annual design challenge. But for it to have a chance at working, we’re going to need to remove all of the friction associated with building this kind of housing.

    These would need to be permissible as-of-right. No rezoning. No site plan control. Just straight to building permit.

    We would also need to eliminate all parking requirements (which we are thankfully doing). The market will very quickly correct if these homes cannot be rented without parking.

    We would need to ensure that these homes can be built without any cooperation from the adjacent neighbors. Because that cooperation may not always be there.

    We would need to ensure that there are no funny code requirements that might serve as an additional obstacle.

    And we will probably also need to look at subsidies and other incentives so that these homes are economically feasible to build. This might include development charge waivers and/or tax abatements.

    None of this is, of course, impossible. It’s just a question of how bad we want this to happen.

    Image via Smart Density

  • Mid-market missing middle housing in Victoria

    I am a big fan of Victoria-based developer Aryze. And their Pearl Block project is a good example of why. Developed on an awkward triangular lot that had been sitting vacant for nearly 65 years and that presumably every other developer had been overlooking, the project brought six family-oriented townhouses to the Oaklands neighborhood of Victoria, BC.

    Each of the towns has 3 bedrooms. Each has a living room facing the street (but with privacy from the neighbor). Each has a large rooftop deck (with 5 foot parapet walls so no kids fall over). And according to the developer, each sold for less than the average price of a single-family home in the Oaklands area. Not surprisingly, the project also won all sorts of awards.

    It is a great example of the kind of beautiful and mid-market missing middle housing that so many of us are always talking about. Why build 1 home when you can build 6? Why build 6 homes when you can build 18? Still, there remains far too many obstacles in the way of any sort of housing that doesn’t conform to the status-quo:

    It shouldn’t be this difficult. And it shouldn’t take this long. Actually, let me rephrase this. It can’t be this difficult and it can’t this long; that is, if we’re expecting to actually come close to meeting the demand for new housing. There is no great mystery as to why the missing middle is, you know, missing. We made it that way.

    Keep up the great work team Aryze.

    Photography: Ema Peter via D’Arcy Jones Architects

  • 6-unit missing middle site for sale in Toronto

    Marty over at Laneway Housing Advisors published this listing in his newsletter today. It’s for an entitled lot at 78 Gladstone Avenue in Toronto that has been approved (by way of a minor variance) for 6 units. Five units in the front where a house currently sits and one unit at the back in a standalone laneway suite. Though it also happens to be a corner lot and so the laneway suite isn’t really “in the back”.

    It’s listed for $2.5M. And according to the description, you can build about 5,500 square feet (4,200 sf in the front with a 1,300 sf laneway suite). This ask translates into a land cost that is just over $450 per buildable square foot, which is far more than what high-density land typically trades for in the city right now. This is usually the case for smaller low-rise sites.

    To help put this figure into some kind of context, Bullpen Consulting published in their latest insights report that the average high-density land price in Q4-2021 was $135 per buildable square foot in Toronto (416 area code only). Of course, averages only tell you so much. To truly evaluate the feasibility of a site like this, you’d need to create your own pro forma and do your own residual land value calculation. The value of development land depends on what you can build on it.

    If you were to do that, I suspect that you would discover at least two things: 1) you would find it challenging to make the numbers work, particularly for rental housing, and 2) you would quickly realize that this sort of “missing middle” housing isn’t, in its current form, some undiscovered bastion of housing affordability.

    Part of the problem is that these 6 units are not being delivered on an as-of-right basis. Somebody had to go out and entitle the land in order to secure these permissions. That means that time and money were spent and that the current owner is now rightly seeking a margin for their efforts. But if we collectively believe that this is an appropriate and sensible form of housing, then this should not be a necessary step in the whole process. Especially for only 6 units.

    All of this being said, we know that Toronto and many other cities around the world are taking a hard look at this issue. And that there is a groundswell of interest in allowing more housing in our low-rise communities. It’s going to be a battle — just look at how Toronto’s new garden suite policies have now been appealed by various resident’s groups. But I’m certain that we’ll get there, just like we are getting there with laneway housing and other types of ADUs.

  • Toronto is on the verge of finding the missing middle

    Toronto’s chief planner Gregg Lintern (who you can follow over here on Twitter) was recently in the Toronto Star talking about the city’s plans to allow more multi-unit dwellings in our low-rise single-family neighborhoods.

    I was careful to say “more” because they are already permissible in some areas. The challenge is that they’re not happening at any sort of meaningful scale, which is an obvious signal that some key ingredients are still missing.

    Or perhaps there are too many required ingredients. For example, right now the zoning by-law requires one car parking space for every dwelling in a multi-unit building. This is, of course, dumb and the requirement should be completely eliminated.

    Changes like this, as well as many others, are long overdue. Not just in Toronto, but in many other cities. And it is partially what I was getting at when I wrote about laneway housing this past weekend and hinted at the need for other solutions to increase housing supply.

    So when you have a few minutes, I would encourage you to complete the city’s survey on expanding permissions for multiplexes across the city. I just did it and voted to bring on the multiplexes.

    Photo by Tiago Rodrigues on Unsplash

  • Toronto releases draft garden suite regulations

    As most of you know, laneway suites (a form of accessory dwelling unit) are permitted “as-of right” across the City of Toronto. This has led to an explosion of new laneway housing. One framing contractor that I know recently told me that he is now doing a new laneway house every month. Incredible considering how out-there they were only 10 years ago.

    However, there are a few barriers to participation with the current policies, one of which is that you need to be adjacent to a laneway in order to have an eligible lot. So the City has been working on adapting these policies to suit residential properties without a public lane. These new accessory dwelling units are being referred to as “garden suites.”

    The draft garden suite regulations are now available online and will be heard at Planning and Housing Committee next week. The recommendations are that these regulations form the basis for further community engagement, and that a final report be brought back to the Committee in Q4 of this year.

    This final report is expected to recommend Official Plan policies and Zoning By-law regulations so that garden suites, along with laneway suites, can be as-of-right across the city. This is great news. So if you have a lot without a public lane and you’re considering an ADU, now might be a good time to start planning.

    The best place to start doing that would be with these draft regulations.

  • 225 Brunswick Ave is yet another example of why the missing middle is so damn hard to deliver

    Building buildings is really hard.

    It’s hard for countless reasons, but one reason in particular is that it can be difficult to please everyone. Take parking, for example. This is often a primary concern when you’re trying to develop something new. Too little parking and people might be concerned that cars will start flooding the surrounding streets in search of a spot. Too much parking and people might be concerned about traffic congestion. So it can often feel like you’re damned if you do and you’re damned if you don’t.

    I thought of this as I was reading through Alex Bozikovic’s recent opinion piece in the Globe and Mail called, “Yes, in my backyard: How urban planning must shift to meet our postpandemic challenges.” In it, he mentions a small missing middle-type infill project at 225 Brunswick Avenue here in Toronto. A century-old office building located in a residential neighborhood, a small developer has been working (with Suulin Architects) since 2018 to convert it into seven apartments.

    Here are a few photos:

    This is the kind of infill housing that planning staff and many councillors are trying to encourage across the city. And yet, the year is 2021. This developer is on year three in a process that will, maybe, deliver a total of seven new rental homes. There are also many other examples that we can point to in the city that have faced similar challenges, like this one here on Gerrard Street East. While not nearly as interesting architecturally speaking, it would have delivered 10 new homes proximate to transit. Maybe that will still happen. I can’t say for sure.

    I’m not going to get into the specifics of any one proposal, but two things are clear to me: (1) Our city, and many other cities around the world, have a need for more missing middle-type infill housing and (2) our system is greatly flawed if it takes years and years to ultimately green light the delivery of only a half dozen or so new homes.

    Time equals money. And when we make the process this difficult it means that many developers aren’t going to bother (because the math probably doesn’t work) and that the ones who are successful will need to absorb a bunch of unnecessary costs in the end pricing/rents of their homes (i.e. make the homes more expensive than they need to be).

    225 Brunswick is exactly the kind of project that I would love to work on: a small-scale adaptive reuse project where design is clearly a priority. But with a 3-4 year entitlement timeline (perhaps longer?), it’s simply not worth it (though I do commend the efforts of the project team). I’m sure many others feel the same way that I do and that’s unfortunate when you’re trying to build a more vibrant, inclusive, and competitive global city.

  • The year of the missing middle

    It is starting to feel like 2021 could be a turning point for “missing middle” type buildings here in Toronto. Momentum seems to be growing and there’s increasing interest in finding ways to make this scale of housing more feasible — everything from duplexes to low-rise walkup apartments.

    This week Councillor Bradford published a great op-ed in Spacing Toronto as a kind of call to action: Let’s make this year the year. In it, he provided an update on a pilot project that will be taking place in his ward — Beaches-East York — this year:

    We’ll be setting out this spring to find a city-owned site and the right partners for the project. From there, the work will be to go through every step of the development process, from design to construction. This Pilot is about accomplishing two key tasks. One, building housing that meets the Missing Middle typology while aiming to incorporate the affordability and sustainability elements Toronto needs. Two, through undertaking that development process, to identify the execution issues so we can bring forward the policy corrections that’ll make what we achieve in the Pilot build replicable across the city.

    With the continued run-up in single-family home prices, it really is starting to feel like we’re at a tipping point. Something is going to need to change. People continue to move to Toronto from all over the world. Perhaps this year will be the year. To learn more about the pilot project, take a look at this update report.

  • The most unremarkable streets in Toronto

    Within Toronto’s urban structure you have regular streets and you have things known as “Avenues.” (This is among a bunch of other stuff such as Centres and Employment Areas.) What this Avenue designation does is tell you that it may be a suitable location for a new mid-rise building, which is something that I have written a lot about on this blog. Here in Toronto, this means that you would then need to consult the “Mid-Rise Building Performance Standards.” Indeed, if you dust off these standards and turn to the introduction, you’ll find the following: “The Performance Standards are intended to provide simple, straightforward guidance for those seeking to develop midrise projects on the Avenues.”

    But if you want to find some of the most truly unremarkable streets in this city, you need to look at the arterial roads that didn’t quite make the cut to be an Avenue. I don’t want to generalize, but they are generally exceedingly ugly. You can’t help but feel like Toronto has simply outgrown the low-rise building typologies that, in most cases, still remain on these streets. In some cases, they’re also directly adjacent to a subway station, which is kind of like running a great big movie theater with only a handful of seats inside. Maybe one day they’ll grow up to be Avenues. But don’t hold your breath. So what’s another possible solution? Toronto-based PHAEDRUS Studio has an idea. It’s called the Hi-Lo Hybrid.

    Initially designed for a specific client and a specific site, it also happens to be something that could be deployed all across the city. What they have shown here is a 5 storey infill building on your typical long and narrow Toronto lot. As designed, it could house 4-8 units, as well as some non-residential uses, on a lot that previously only had 1-3 units. It would make a lot of sense for some of the ugly streets that I’m talking about. But let’s be honest: it would be almost impossible to get approved. One of the biggest issues would probably be the adjacency/overlook issue that it generates with the neighboring backyards. It’s probably also too tall.

    One of the main reasons why, I think, laneway suites work and are now permissible as-of-right in Toronto is that they replace existing garages. (ADU’s for the Americans.) They reallocate space that was previously used for cars to humans. And so the incremental height / density is not all that great. They, for the most part, preserve precious neighborhood character. What the Hi-Lo Hybrid proposes is not so incremental. It’s bold. It would be a massive fight. I know that and you know that. But bold is generally what you need when you’re trying to do great things and when you’re trying to shape the future. And so with that, I’ll leave you all with some words from the late American architect, Daniel Burnham.

    “Make no little plans; they have no magic to stir men’s blood and probably themselves will not be realized. Make big plans; aim high in hope and work, remembering that a noble, logical diagram once recorded will never die, but long after we are gone will be a living thing, asserting itself with ever-growing insistency. Remember that our sons and grandsons are going to do things that would stagger us. Let your watchword be order and your beacon beauty.”

  • A new Frame Home in Brooklyn

    Fred Wilson (venture capitalist) and Joanne Wilson (also an investor) have been working on a passive house apartment building in Brooklyn for the last five years. Their development company is called Frame Home. And this past week they received a pretty great Christmas gift in the form of a Temporary Certificate of Occupancy from NYC Buildings.

    At 5 storeys and with only 10 two-bedroom units, you could classify this building as the kind “missing middle” housing that gets so much air time here in Toronto. And so not only have they managed to build relatively small, but they’ve done it using passive house design principles.

    Here are some of the apartment building’s features:

    • Cross-laminated timber (CLT) structure
    • Passive house design approach
    • Triple-pane windows
    • Interior polished and insulated concrete walls (presumably to act as a thermal mass to moderate heating/cooling throughout the year)
    • Solar panels installed on the upper facade and roof (passive house design should, in theory, allow these to supply a big chunk of the building’s energy needs)
    • No fossil fuels used throughout the building — everything is electrical
    • Fully sub-metered units
    • Outdoor circulation spaces/stairs, providing access to a shared rooftop courtyard (I’m assuming these also serve as required egress for the building)
    • Dedicated elevator entrance for every suite (i.e. no interior circulation/corridor spaces)
    • Composting facilities within the building
    • Bike room connected to the ground-floor lobby

    There’s also a co-working and community space planned for the ground floor called “Framework.” Interestingly enough, they have already responded to the current pandemic. Instead of open-air desks, you rent fully enclosed 8′ x 8′ pods that are sound-proofed and come with their own HVAC systems.

    Congratulations Fred and Joanne on such an exciting and pioneering project. (I would love to see the development pro forma!) If you’d like to learn more about Frame 283, here is their website and here is a profile that the New York Times did on the project back in January. Building with CLT is apparently prohibited in NYC. Frame 283 got an exemption.

  • The case for density transition zones (and why people will probably hate them)

    Toronto is known for its tall buildings and its contrasting low-rise neighborhoods. More recently, we have seen a proliferation of mid-rise buildings along the city’s “Avenues.” This is despite the many challenges and costs associated with this building typology.

    But I think it’s pretty clear that a further evolution is also underway. Laneway housing, which is now permitted “as-of-right,” is in the early stages of being adopted and built out all across the city. And eventually I think we’ll see many of Toronto’s laneways evolve into fully fledged residential streets; perhaps not all that dissimilar from what you might find in compact cities like Tokyo.

    This is very exciting to me and I think of it as the city gaining a third hierarchy of residential streets. We’d have our major arteries and avenues. We’d have our residential side streets. And then we’d have our compact laneways. Dare I say that maybe some of these laneways could even house non-residential uses such as small-scale offices.

    But along with this shift, I think it’s time we look at another infill opportunity — something that planners Blair Scorgie and Sean Hertel are calling “density transition zones.” What these zones hope to be is a new middle transition zone between low-rise neighborhoods (where laneway suites are already permitted) and mid-rise avenues. A place where “missing middle” type housing might be built in close proximity to major streets and existing transit. Let’s call it a 100-200m zone that sits right behind our avenues.

    In my mind this is immediately beneficial for two reasons. The first is obvious. It could be a place for frictionless missing middle housing. Housing that’s more dense than a single family home + laneway suite, but less dense than a typical mid-rise building.

    The second immediate benefit is that this transition zone could be used to help improve the overall feasibility of mid-rise avenue development. The reality is that there are many blocks along Toronto’s avenues where the lot depths are simply too shallow for proper mid-rise buildings. Density transition zones could help with this, which would be not that dissimilar from how “Enhancement Zones” were intended to work (they were never approved).

    If this were to happen, I think there would also be a strong case for softening some of the “requirements” in the mid-rise design guidelines. Requirements like the 45 degree angular plane that new buildings generally need to conform to. All of this would only help the overall feasibility of more European-scaled developments along Toronto’s avenues and, in my opinion, that would be a great thing.

    But for the same reasons that Enhancement Zones were highly contentious, I would expect a lot of grouchy people and a lot of pushback on this idea. There will be concerns about encroaching on our single-family neighborhoods, and there will be the usual objections that come up with any new development (density, traffic, dog poo, etc.) But if we’re serious about building more missing middle housing, we are going to need to find ways to remove the barriers to entry. This scale of housing is simply too small to support a great deal of friction.

    To learn more about how density transition zones might work, I would encourage you to check out the great site that Blair and Sean have put together, over here.

    Image: Density Transition Zones