Kelly Alvarez Doran shared this article with me on Twitter earlier today. It talks about some of the work that his design studios are doing at the University of Toronto around embodied carbon. More specifically though, his studios are being tasked with figuring out how to halve the carbon emissions generated by new buildings during this decade.
And one of the big findings from his studio is exactly the title of this post: our buildings have become carbon icebergs. Here in Toronto, we tend to build a lot of below-grade parking. We recently got rid of parking minimums (which obviously needed to happen), but the market still demands it in certain areas and for certain projects. So we continue to build it.
What the above section drawings are showing is the percentage of carbon emissions resulting from the below-grade construction component in each project. And as you can see, the numbers are significant, particularly in the case of smaller mid-rise buildings where you don't have a lot of above-grade area to grow the denominator.
Looking at 2803 Dundas Street West, which is just down the street from our Junction House project, the number is 50%! And sadly, I would guess that our project is probably only marginally better; we're a bit taller up top, but we also have a raft slab foundation and a watertight below-grade.
This is one of the reasons why I recently tried to make the case for above-grade parking. A big part of my argument was that if we want parking that can be adapted to other uses in the future, and if we want to reduce the embodied carbon in our buildings, then we should be building "unwrapped" above-grade parking. That is, parking which isn't hidden behind other uses.
But this is often frowned upon in planning circles and it's not going to be feasible in smaller mid-rise buildings like the ones shown here. We're also just talking about what is less bad. What we really ought to be doing is trying to build our cities so that people don't need to rely so heavily on cars to get around.
Image: Ha/f Studio

Brian Potter, of Construction Physics, recently tried to determine which cities build skyscrapers the fastest.
Here's how he went about that:
He started by looking up the 50 largest cities in the world on Wikipedia
He then pulled data from the Council on Tall Buildings and Urban Habitat to get a list of every skyscraper completed between 2000-2020 that was over 100 meters, had a start and completion date, and had a gross floor area
The result was a list of 986 skyscrapers completed in 39 cities, most of which (~740) were completed in the US, China, Japan, and Canada
Finally, he calculated completed square feet per year and made some charts
Here are the results:

Kelly Alvarez Doran shared this article with me on Twitter earlier today. It talks about some of the work that his design studios are doing at the University of Toronto around embodied carbon. More specifically though, his studios are being tasked with figuring out how to halve the carbon emissions generated by new buildings during this decade.
And one of the big findings from his studio is exactly the title of this post: our buildings have become carbon icebergs. Here in Toronto, we tend to build a lot of below-grade parking. We recently got rid of parking minimums (which obviously needed to happen), but the market still demands it in certain areas and for certain projects. So we continue to build it.
What the above section drawings are showing is the percentage of carbon emissions resulting from the below-grade construction component in each project. And as you can see, the numbers are significant, particularly in the case of smaller mid-rise buildings where you don't have a lot of above-grade area to grow the denominator.
Looking at 2803 Dundas Street West, which is just down the street from our Junction House project, the number is 50%! And sadly, I would guess that our project is probably only marginally better; we're a bit taller up top, but we also have a raft slab foundation and a watertight below-grade.
This is one of the reasons why I recently tried to make the case for above-grade parking. A big part of my argument was that if we want parking that can be adapted to other uses in the future, and if we want to reduce the embodied carbon in our buildings, then we should be building "unwrapped" above-grade parking. That is, parking which isn't hidden behind other uses.
But this is often frowned upon in planning circles and it's not going to be feasible in smaller mid-rise buildings like the ones shown here. We're also just talking about what is less bad. What we really ought to be doing is trying to build our cities so that people don't need to rely so heavily on cars to get around.
Image: Ha/f Studio

Brian Potter, of Construction Physics, recently tried to determine which cities build skyscrapers the fastest.
Here's how he went about that:
He started by looking up the 50 largest cities in the world on Wikipedia
He then pulled data from the Council on Tall Buildings and Urban Habitat to get a list of every skyscraper completed between 2000-2020 that was over 100 meters, had a start and completion date, and had a gross floor area
The result was a list of 986 skyscrapers completed in 39 cities, most of which (~740) were completed in the US, China, Japan, and Canada
Finally, he calculated completed square feet per year and made some charts
Here are the results:


And here's one thing he had to say about them:
Interestingly enough, the huge outlier in slow construction isn't the US, but Canada, with an average skyscraper construction speed of half that of the US’s.
For a lot more information on this topic, click here.
Thankfully shoring works are now complete at One Delisle and we have started on the big hole part (see above photo from our rooftop cam). The next major milestone will be our "bottoming out," and that's when the tower crane will go up and our massive raft slab foundation will get poured. Visible progress is certainly more fun.

And here's one thing he had to say about them:
Interestingly enough, the huge outlier in slow construction isn't the US, but Canada, with an average skyscraper construction speed of half that of the US’s.
For a lot more information on this topic, click here.
Thankfully shoring works are now complete at One Delisle and we have started on the big hole part (see above photo from our rooftop cam). The next major milestone will be our "bottoming out," and that's when the tower crane will go up and our massive raft slab foundation will get poured. Visible progress is certainly more fun.