# Construction update: Junction House **Published by:** [Brandon Donnelly](https://brandondonnelly.com/) **Published on:** 2022-03-10 **Categories:** 2720-dundas-street-west, concrete-piles, construction, development, dundas-street-west, fly-forms, junction-house-condos, mid-rise-building, the-junction, toronto **URL:** https://brandondonnelly.com/construction-update-junction-house ## Content This is a photo of Junction House that I took this morning after our weekly construction meeting. The team is currently preparing for the first concrete pour of level 4 (each floor has been split up into three pours). We're now flying our forms, which means that we're able to move a lot faster. This is the exciting part of a new build mid-rise like Junction House. The underground garage part is like watching paint dry. We're scheduled to be topped out by this summer, so expect some gratuitous view photos on the socials. ## Publication Information - [Brandon Donnelly](https://brandondonnelly.com/): Publication homepage - [All Posts](https://brandondonnelly.com/): More posts from this publication - [RSS Feed](https://api.paragraph.com/blogs/rss/@brandondonnelly): Subscribe to updates - [Twitter](https://twitter.com/donnelly_b): Follow on Twitter ## Optional - [Collect as NFT](https://brandondonnelly.com/construction-update-junction-house): Support the author by collecting this post - [View Collectors](https://brandondonnelly.com/construction-update-junction-house/collectors): See who has collected this post